Detached houses at Darras Hall
Big roofs, often facing more than one way, with a garage that makes a handy spot for a battery.
Ponteland, Northumberland
Large detached houses and bungalows on generous plots at Darras Hall, older homes near the village centre and newer estates on the edge of the village. Wide roofs here often have room for a bigger system.

Space is the big advantage here: wide roofs, garages and driveways.
Big roofs, often facing more than one way, with a garage that makes a handy spot for a battery.
Low, wide roofs with easy access, so scaffolding is simpler. Many have room for a tidy row of panels.
Older stone and brick houses near the river and the church. Check whether yours is listed or in a conservation area first.
Charge a car at home? Say so on the form, and the installer can size panels and a battery with that in mind.
Northumberland County Council handles planning here. If your home is listed or in a conservation area, check with the council before you commit.
Covenants. Some estates have covenants in the deeds about changes to the outside of a house. It's worth a look at yours.
Everywhere else. Panels on a house roof often don't need planning permission in England, but there are conditions. The Planning Portal sets them out (rules from 27 August 2026).
The grid. Ponteland is on Northern Powergrid's network. Your installer tells them about your system, and larger systems need the network's approval first.
Use the short form at the top of this page, or the full form to tell us more about your roof and battery plans.
It can be. Panels on both slopes catch the morning and afternoon sun. The installer will work out what yours could make.
Garages are a common spot. The installer checks the space and the cable route to your fuse box.